·Chinese(gb) ·English ·ฉบับภาษาไทย ·Tiếng Việt
WAPWeb Accessibility RSS
Home About Liuzhou Government Liuzhou News Live in Liuzhou Travel in Liuzhou Invest in Liuzhou Interact
Current Location:  Home > Liuzhou News > Liuzhou News
 
Steel box girder of Guantang Bridge in Liuzhou successfully closed
 
Date:2018-10-09 By:Shuhou Li Source:www.liuzhou.gov.cn
图片3.jpg

Recently, the steel box girder of the Guantang Bridge in Liuzhou was officially closed. Guantang Bridge is the 21st river-crossing bridge in urban section of Liujiang River. It is invested by China Railway Shanghai Engineering Bureau and is the largest thrust basket-type steel box arch bridge in the world with a span of 457 meters. The 462-meter-long deck is connected by 148 slings and two hanging arch ribs. The bridge looks like a handle of a basket and a new crescent moon. The steel box girder of the bridge is single-box, single-chamber, flat, streamlined and all-welded. The steel box girder of the bridge is divided into no-cable zone and cable zone. The total number of steel box girders is 44, and the total length and width of the steel box girders is 461.66 meters and 39.5 meters, respectively. And the maximum lifting weight is 245 tons.

It is known that the Guantang Bridge goes across Liujiang River, linking Lianhua Avenue in the west and Donghuan Avenue in the east. The length of the main line of the bridge is 1,155.5 meters. After the closure of the bridge project, the follow-up construction such as bridge deck pavement and traffic engineering will be carried out in an all-round way. The bridge will be fully opened to traffic by the end of 2018. It will play a positive role in solving the traffic jam between the northeastern district of the river and the Liudong New District and promoting the economic development of the Liudong New District. It will also serve as a gift for the 60th anniversary of the founding of Guangxi.

   Print   To Top    Close  
0

Related Articles

Middle sections of Guantang Bridge finish closure
Side parts of Guantang Bridge's main arch finished
Main arch of Guantang Bridge installed
Construction of Guantang Avenue Overpass takes shape
Two berths in Guantang operating zone to be built by end of 2017
Construction of Guantang Bridge speeded up
The Main Body of Guantang Bridge Starts Construction
Liuzhou City to Launch Rebuilding and Expansion Projects on Teaching Facilities
Fengshan-Section Rongjiang Bridge is Expected to Open in October
5885 Tons! The Middle Arch of Liuzhou Guantang Bridge is Hoisted in Place
   
Home  │ About Liuzhou  │ Site Map  │ Service and Privacy │ FAQ │ Download Forms   │ Contact Us
Copyright (C) 2006 The People's Government of Liuzhou Municipality,All Rights Reserved
Sponsored by Liuzhou Informational Leading Group Office (The Bureau Of The Information Industry Of Liuzhou)
Prepared by Liuzhou Network Management Centre Address:No. 66, Sanzhong Road, Liuzhou, China
ICP Certificate No.05009280